The Deadman's Basin Water Users Association (DBWUA) consists of 110 irrigators on the Musselshell River encompassing nearly 200 meandering miles between Shawmut and Mosby Montana. DBWUA diverts Musselshell River water into an off-stream storage facility, Deadman's Basin Reservoir, via an 11.5 mile supply canal and delivers contract water via two outlet canals, the 2.85 mile long Barber canal and the 9.5 mile long Careless Canal. Deadman's Basin reservoir has a total capacity of 72,220 acre feet at full pool. There are currently 40,500 acre feet of water contracted for from the reservoir.



Inlet Drop at Deadman's Basin Reservoir




CURRENT WATER INFORMATION

(updated 6/19/156 @ 3:00 pm.)

Reservoir Storage
61,000 AF
Inflows
0 CFS
Outflows
160 CFS
Water Orders
140 CFS


To order water, please email DBWUA Project Manager Teri Hice at kthice@midrivers.com


NEWS UPDATE
(updated 6/19/16 @ 3:00 p.m.)

The release gates for reservoir are damaged. Temporary repairs failed to improve the situation.

The constant adjusting could lead to a total failure which would drain the reservoir. Additional engineering assistance has been requested to provide a plan that will allow continued releases without further damages.

Therefore, water release changes will be minimized which could result in exceeding orders on certain days and marginal availability on others. Please bear with us during this critical period.

Notify Teri Hice when you wish water and when delivery is completed.

THE MRDP WILL BEGIN AT 6:00 A.M. ON MONDAY, APRIL 25th.

THE 2016 IRRIGATION SEASON DELIVERY PERCENTAGE IS INITIALLY SET AT 75% .

ALL IRRIGATORS MUST HAVE A FUNCTIONING MEASURING DEVICE IN PLACE PRIOR TO ANY CONTRACT WATER DIVERSION!!!

ALL CONTRACT WATER MUST BE ORDERED PRIOR TO DIVERSION

ALLOW 24 HOURS ABOVE RYEGATE

ALLOW 2 DAYS ABOVE LAVINA

ALLOW 3-4 DAYS ABOVE ROUNDUP

ALLOW 4-5 DAYS ABOVE MUSSELSHELL

ALLOW 6 DAYS OR MORE ABOVE MOSBY

 

 

The Deadman's Basin Diversion Dam Rehabilitation Project was rebid in February. The low bid received was $250,000 lower than the lowest bid received in 2014. The contract award was issued this week and the project construction will begin August 17th.

The project will consist of replacing the existing radial arm gates with 4 new six foot slide gates and a new concrete structure. The vertical concrete diversion dam will become a gently sloped rock ramp that will be fish friendly.

Total construction costs are currently estimated at $900,000 and will be paid for as follows:

RRGL grant $100,000

RDG Grant $145,000

FEMA Grant $60,000

Future Fisheries Grant $82,400

DBWUA $512,600 (Will be paid from a combination of O&M, Reserve Fund Savings, and Loans)

 

 

THE HISTORICAL DATA CHART BELOW REFERS TO THE DELIVERY PERCENTAGE IN PAST YEARS. NOTE THE *** BY THE PERCENTAGE. IT IN NO WAY REFERS TO THIS SEASON. THE DELIVERY PERCENTAGE IS SET IN THE COURT ORDER AND WAS MAILED TO EVERY SHAREHOLDER PRIOR TO THE COMMENCEMENT OF THE IRRIGATION SEASON.

 

PLEASE CALL JOHN ROUANE OR TERI HICE TO ORDER OR CANCEL A WATER ORDER ONCE YOU HAVE FINISHED. MAINTAINING RIVER FLOWS ARE CRITICAL NOW AND DEPEND ON GOOD COMMUNICATION SO THAT ORDERS CAN BE FILLED IN A TIMELY MANNER AND WATER IS NOT WASTED.

PLEASE ORDER WATER SEVERAL DAYS IN ADVANCE OF WITHDRAWAL FROM THE RIVER

 

 

 

********

 

 

SNOW REPORTS

 

 

 

HISTORICAL DATA

Mid-March & Mid-April Data for 8 years:

Year
Storage For Mid-March
Inflow For Mid-March in CFS

Storage For Mid-April

Inflow For Mid-April in CFS

Diverted during the MRDP in AF
%Delivered
2009
44,401
55
47,099
80
  *100% *

2008

24,740
60
25,572
20
30,000

100%

2007
35,481
75
42,166
70
3,062
100%
2006
37,668
100
41,229
96
10,338
100%
2005
19,058
12
20,768
0
27,206
100%
2004
18,726
23
20,823
0
1,637
38%
2003
19,871
44
23,300
54
7,770
75%
2002
15,986
39
18,011
51
0
25%

 

 

** 90% ** of NEW WATER PURCHASE CONTRACTS IN 2009

 



CONSTRUCTION / REHABILITATION

Construction at DB 21 wasteway by Martin Excavating
DB 21 wasteway completed in 2006



CURRENT PROJECTS

BARBER CANAL AT HEADGATE
(Click on thumbnail to see larger photo)

Below diversion headgate prior to construction
reshaping below diversion headgate
placing riprap below diversion headgate
rip rap placed and running 200 cfs

 

BARBER CANAL AT 80 FOOT DROP
(Click on thumbnail to see larger photo)

erosion at bottom of 80 foot drop
damage to concrete
displaced rip rap
6 foot deep erosion under concrete



2015 O & M PROJECTS

  • Concrete repairs to Careless Chute Drop #1
  • Install seepage "curtain barrier" at Careless diversion
  • Add riprap to Barber diversion
  • Pour new concrete slab for Barber Sontek device
  • Remove sandbars from lower Barber
  • Apply canal seal to largest seep areas in Barber and Careless Canals prior to water releases
  • Weed management on all canals

 

 